07-08-2019 07:20 PM
Hello, everyone.
When I watched "Report Timing Summary", I found "Total Number of Endpoint" differ from "Timing Summary - impl_1".
#"Timing Summary - impl_1" means result of "Open Implemented Design".
"Report Timing Summary" has more endpoints than "Timing Summary - impl_1".
What is difference?
Thank you.
07-08-2019 07:37 PM
Hi @yukkmn ,
Design Timing Summary is a sub report of Report Timing Summary. Check page number 30 of below link:
Thanks,
Raj
07-08-2019 07:37 PM
Hi @yukkmn ,
Design Timing Summary is a sub report of Report Timing Summary. Check page number 30 of below link:
Thanks,
Raj
07-08-2019 08:55 PM
Hi, rshekhaw.
I want "Design Timing Summary" means result of "Open Implemented Design". It is not sub category.
In "Design Runs" tab, I think "WNS","TNS" and etc are the same value in "Timing" tab.
But when I retrid to get timing information by "Report Timing Summary", NEW tab said it differ from first result.
I want to kow this issue!
What is the firtst timing tab name resulted of "Open Implemented Design"? I don't know this name. So It made me difficult to explain status.
Thankyou.
07-08-2019 10:49 PM
The two should match.
The Design timing summary automatically opened after opening implemented design was the timing summary report generated at the end of Implementation run.
Then the "report timing summary" that was manually run in the implemented design should give the same "WNS/TNS..." results if you were using the default settings.
If they don't match, can you attatch the two reports?
-vivian